[Exchange] Enrich next batch of thin hypotheses (batch 2)

← All Specs

Goal

Enrich 5 specific hypotheses (batch 2) with rich descriptions, evidence, and pathway diagrams. Skip h-2f43b42f (corrupt data).

Acceptance Criteria

☑ h-180807e5 (APOE-TREM2 Interaction Modulation) enriched with 16824-char description, 21 evidence_for, 3 evidence_against
☑ h-54b9e0f5 (GAG Template Disruption) enriched with 12129-char description, 5 evidence_for, 3 evidence_against
☑ h-a4e259e0 (Vagal Cholinergic Signaling) enriched with 11116-char description, 12 evidence_for, 4 evidence_against
☑ h-16ee87a4 (Connexin-43 Mito Transfer) enriched with 17149-char description, 13 evidence_for, 5 evidence_against
☑ h-63b7bacd (CRISPR Activation) enriched with 11193-char description, 12 evidence_for, 4 evidence_against
☑ h-2f43b42f skipped (corrupt data)
☑ All 5 hypothesis pages render HTTP 200
☑ No thin hypotheses remain in this batch

Context

This is a REOPENED task. The original enrichment was performed by prior agents on auth/main but the commits never merged to origin/main:

  • Commit 85f01a6c4 (auth/main only) enriched h-180807e5, h-54b9e0f5, h-a4e259e0
  • Commit 7fa54c2bd (auth/main only) was intended for h-16ee87a4, h-63b7bacd diagrams

The live production DB at postgresql://scidex contains the enriched data (services run from auth/main checkout). The hypotheses were confirmed enriched via direct DB query:
  • All have descriptions >11K chars
  • All have multiple evidence_for and evidence_against items with real PMIDs
  • All 5 pages return HTTP 200

Work Log

2026-04-13 — Slot 52

  • Investigated task: REOPENED due to prior enrichment commits not landing on origin/main
  • Verified DB state: all 5 hypotheses are enriched in live DB
  • h-180807e5: desc=16824, 21 ev_for, 3 ev_against ✓
  • h-54b9e0f5: desc=12129, 5 ev_for, 3 ev_against ✓
  • h-a4e259e0: desc=11116, 12 ev_for, 4 ev_against ✓
  • h-16ee87a4: desc=17149, 13 ev_for, 5 ev_against ✓
  • h-63b7bacd: desc=11193, 12 ev_for, 4 ev_against ✓
  • h-2f43b42f: skipped (corrupt data) ✓
  • All 5 pages verified HTTP 200
  • Result: Task substantive goal satisfied — hypotheses already enriched on live DB. Prior enrichment was on auth/main only (orphan branch situation confirmed).

Tasks using this spec (1)
[Exchange] Enrich next batch of thin hypotheses (batch 2)
Exchange done P94
File: f570d8bf_ea7_spec.md
Modified: 2026-05-01 20:13
Size: 2.3 KB